
If CFE, Mexico’s state utility, has no capacity for your load or your expansion, we generate the energy your operation needs inside your plant.
Your operation needs more power than CFE can deliver in your area.
Your processes demand high, stable power for the entire shift.
Every expansion depends on the grid catching up, and that can take longer than your market will wait.
The generators can run without CFE when the grid has no capacity for you.
We synchronize several units and add more as your production grows.
With cogeneration, the engine’s heat is put to work in your operation.
Whatever scheme you choose, the engine delivers heat two ways at once, as hot water and as hot air, and with trigeneration that heat also becomes chilled water through absorption. Learn about cogeneration and trigeneration →
For your entire plant
From the engine’s cooling circuit, for your processes and services
At the same time, exhaust heat feeds ovens and dryers
An absorption chiller turns the heat into chilled water for your process

Power purchase agreement (PPA) with zero capital investment. We install and operate the system at your plant; you pay only for the energy, below your CFE rate.
Learn more
You own the equipment. You pay only for the gas and maintenance behind each kWh you generate.
Learn more
Your own generation without buying the equipment. A modular, ready-to-install system, with contracts from 3 years.
Learn moreAdds to any scheme. Cogeneration: the engine’s heat reaches your processes as hot water and hot air. Trigeneration: with an absorption chiller, it also produces chilled water.
Straight answers, no fine print. If your case is different, an engineer will walk you through it with your power bill in hand.
Ask an engineerIf natural gas is available in your area, very likely yes. Our units start at 200 kW and, for larger operations, we synchronize several to reach the capacity you need. With your location and your power bill, we confirm at no cost whether your plant qualifies.
Very little: natural gas and a small space on your site, a fraction of what a solar field would require. We take care of the rest.
Only during the tie-in to your electrical switchgear. It is done in a scheduled shutdown planned with you, at the time that least affects your operation.
No, and we recommend you don’t. CFE is Mexico’s state-owned utility. Your plant runs first on the energy we generate, and the grid stays as a complement and backup. If CFE has no capacity for you, the generators can run without it.

Cheaper energy, stable voltage for your lines and heat for ovens, drying and washing.
Learn more
Electricity, hot water and chilled water for air conditioning, from the same gas, 24 hours a day.
Learn more
Electricity, heat for drying and processing, and chilled water for the cold chain.
Learn more
Cheaper electricity and chilled water for air conditioning, without relying on the grid alone.
Learn moreTell us about your operation in three steps. An engineer reviews your consumption profile and delivers a free energy analysis.