Next step

Let’s talk about your plant.

Tell us about your operation in three steps. An engineer reviews your consumption profile and delivers a free energy analysis.

Step 1 of 3Under a minute
Your operation

What does your company do?

What is your monthly power bill?

What you need

What do you want to solve? Choose all that apply

Your details

We use your details only to prepare your analysis, in accordance with our privacy notice. No cost, no commitment.

All set.

An engineer will review your information and contact you about your analysis. To get a head start, send us your CFE power bill on WhatsApp.

Send bill on WhatsApp
Frequently asked questions

What everyone asks first.

Straight answers, no fine print. If your case is different, an engineer will walk you through it with your power bill in hand.

Ask an engineer

If natural gas is available in your area, very likely yes. Our units start at 200 kW and, for larger operations, we synchronize several to reach the capacity you need. With your location and your power bill, we confirm at no cost whether your plant qualifies.

Very little: natural gas and a small space on your site, a fraction of what a solar field would require. We take care of the rest.

It depends on the size of your system. We define the scheme that suits you best and handle all filings with CFE and Mexico’s energy authorities, so your team doesn’t have to navigate the local regulatory process.

No, and we recommend you don’t. CFE is Mexico’s state-owned utility. Your plant runs first on the energy we generate, and the grid stays as a complement and backup. If CFE has no capacity for you, the generators can run without it.

Request analysisWhatsApp