Industries · Hospitality

Power, hot water and cooling for every guest.

A hotel uses electricity, hot water and air conditioning 24 hours a day. With a single fuel, we deliver all three.

Hospitality

What your operation faces, and how we solve it.

The challenge

01
24-hour consumption

Rooms, kitchen and common areas run all day, every day of the year.

02
Constant hot water

Heating water for every guest is an expense that never stops.

03
Air conditioning

Cooling the hotel is one of the largest electrical loads in the operation.

The solution

Cheaper electricity

Generated at the hotel itself, below your CFE rate.

Hot water from engine heat

Cogeneration heats the hotel’s water at no extra cost.

Chilled water by absorption

With trigeneration, the engine’s heat also produces chilled water for your air conditioning.

Add it to your scheme

Beyond electricity, heat and cooling.

Whatever scheme you choose, the engine delivers heat two ways at once, as hot water and as hot air, and with trigeneration that heat also becomes chilled water through absorption. Learn about cogeneration and trigeneration →

  • Electricity · ≈ 41%

    For your entire plant

  • Hot water · Engine heat

    From the engine’s cooling circuit, for your processes and services

  • Hot air · Exhaust gases

    At the same time, exhaust heat feeds ovens and dryers

  • Cooling · trigeneration · Chilled water

    An absorption chiller turns the heat into chilled water for your process

Case studies · Nuevo LeónSee all projects →

A real case in hospitality.

How to contract it

Choose the scheme that fits you.

Adds to any scheme

Cogeneration and trigeneration

Adds to any scheme. Cogeneration: the engine’s heat reaches your processes as hot water and hot air. Trigeneration: with an absorption chiller, it also produces chilled water.

Learn more
Frequently asked questions

What everyone asks first.

Straight answers, no fine print. If your case is different, an engineer will walk you through it with your power bill in hand.

Ask an engineer

If natural gas is available in your area, very likely yes. Our units start at 200 kW and, for larger operations, we synchronize several to reach the capacity you need. With your location and your power bill, we confirm at no cost whether your plant qualifies.

Very little: natural gas and a small space on your site, a fraction of what a solar field would require. We take care of the rest.

Only during the tie-in to your electrical switchgear. It is done in a scheduled shutdown planned with you, at the time that least affects your operation.

No, and we recommend you don’t. CFE is Mexico’s state-owned utility. Your plant runs first on the energy we generate, and the grid stays as a complement and backup. If CFE has no capacity for you, the generators can run without it.

Other industries

Other industries we serve.

Next step

Let’s talk about your plant.

Tell us about your operation in three steps. An engineer reviews your consumption profile and delivers a free energy analysis.

Step 1 of 3Under a minute
Your operation

What does your company do?

What is your monthly power bill?

What you need

What do you want to solve? Choose all that apply

Your details

We use your details only to prepare your analysis, in accordance with our privacy notice. No cost, no commitment.

All set.

An engineer will review your information and contact you about your analysis. To get a head start, send us your CFE power bill on WhatsApp.

Send bill on WhatsApp
Request analysisWhatsApp